You are buying a new home in Spain and do not know how it works in practice? Below is the whole process in order, from reservation to keys.

Keep in mind that every development has its own terms. This is a general outline, not a description of a specific contract.

Step 1. Choosing and reserving

When you find a home you like, you can reserve it. A reservation is a short agreement and an amount set by the developer, in return for which it takes that unit off the market for a set time. The amount and the period are written in the reservation agreement.

Before paying, read what happens to the amount if you change your mind, and what exactly you are reserving: unit number, price, floor area.

Step 2. NIE and a Spanish bank account

To buy you need an NIE number, the foreigner’s identification number, which is also used for tax. The NIE fee is about 9.84 euro; the consulate in Warsaw quotes 43 zloty. A Spanish bank account is also useful, to pay the instalments and later the utility bills.

Step 3. The private purchase contract (contrato privado de compraventa)

This is the most important document before the notarial deed. It sets out the price, a description of the property, the payment schedule and the delivery date. Usually a part of the price is paid at signing; how much is written in the contract.

Check in it:

Ángel, who is an abogado (a lawyer qualified in Spain), looks after the legal side of the purchase. If you already have your own lawyer, we work with them and pass on all the documents.

Step 4. Staged payments and the guarantee on your money

In new-build, you usually pay in instalments during construction, following the schedule in the contract. Spanish law (Ley 38/1999, first additional provision) protects these payments. The developer must receive them through a bank into a special account kept separate from its other funds and, from the moment it obtains the building licence, guarantee their return with a bank guarantee (aval) or a surety insurance (seguro de caución). If construction does not start or is not completed by the agreed date, or the building does not get the document that allows it to be occupied, you can demand the return of your payments plus legal interest.

That is why with every payment it is worth asking for the special account number and the guarantee document.

Step 5. Inspection and the building’s papers

Near the end of construction you will see the finished home. Make a list of defects and give it to the developer. Before the deed, the building should have a certificate of completion (certificado final de obra) and a first-occupation document. In the Valencian Community this is, by law, a responsible declaration (declaración responsable de primera ocupación) filed with the town hall. A ten-year insurance on the structure is also mandatory.

Step 6. Notarial deed, taxes and registry

Ownership passes to you at the notarial deed (escritura). You pay the rest of the price then. Buying from a developer, you pay VAT (IVA) at 10 % (this also covers up to two parking spaces and a storage room bought together with the home) and stamp duty (AJD), which in the Valencian Community, for a second home (not your main residence), has been 1.4 % since 1 June 2026. The general ITP tax, 9 % since 1 June 2026, applies to resale, not to new-build.

Then the deed goes to the Property Registry (Registro de la Propiedad), where you are entered as owner. The registry has up to 15 working days from filing to do this. Notary and registry fees are set by official scales and depend on the price.

Step 7. Keys and utilities

You get the keys at the deed or just after. Put electricity and water in your name, register with the owners’ community and agree the fees. It is also wise to decide at once who will look after the home when you are away.

Frequently asked questions

Can I buy remotely?

Yes, it can often be done with a notarial power of attorney, but many people prefer to come first and see the area. A power of attorney made abroad usually needs an apostille and, if it is not in Spanish, a sworn translation; the Spanish notary judges whether it is sufficient for the transaction. We agree the details case by case.

Who pays your commission?

The developer pays the commission. We work only with new-build from our own portfolio.

What if construction is late?

It depends on the contract and the guarantee. That is why the dates and the consequences of delay are checked before signing.

Want to see how this works with us?

The first call is free. Tell us what you are looking for and we will prepare a comparison of areas for you.

Tell us what you are looking for

General information, not advice on your case.

Sources

  1. Ley 38/1999 (LOE), DA1 «Percepción de cantidades a cuenta del precio durante la construcción» y art. 19.1.c (seguro decenal), BOE consolidado, consultado · October 26, 2026
  2. IVA 10 % viviendas, garajes (máx. 2) y anexos, art. 91.Uno.1.7º Ley 37/1992; cuadro AEAT 2026, consultado · October 26, 2026
  3. Primera ocupación en la Comunitat Valenciana sujeta a declaración responsable: art. 233.1.f del TRLOTUP (Decreto Legislativo 1/2021), con efectos de licencia (art. 241.4), BOE consolidado (act.… · October 29, 2026
  4. AJD Comunitat Valenciana: 0,1 % en adquisiciones de vivienda habitual (art. 14.Uno.a Ley 13/1997, redacción de la Ley 5/2026, BOE-A-2026-19331) y 1,4 % en los demás casos (art. 14.Cuatro), BOE… · October 29, 2026
  5. Ley Hipotecaria art. 18 (calificación e inscripción en 15 días desde el asiento de presentación)
  6. AJD 1,4 % y ITP 9 % desde 1-6-2026 (Ley 5/2025) · October 26, 2026
  7. Poder otorgado en el extranjero con apostilla de La Haya para comprar: juicio de suficiencia del notario (art. 98 Ley 24/2001), traducción si no está en español; Resolución DGSJFP de 4-6-2020 · November 2, 2026

Talk to us about your case

Message us on WhatsApp Call